Pin Hole Leak vs Moisture Plateau - C

Chiller Evacuation | Pin Hole Leak vs Moisture Plateau

AVRPV in action… the two Chiller vacuums below both look like great finishing results:
·        Left (yellow) → 171 microns
·        Right (green) → 145 microns

But what happens over time tells the real story:
At 3 hours
·        Left: +101 micron rise
·        Right: +104 micron rise
At 6 hours
·        Left: +184 micron rise
·        Right: +138 micron rise
At 9 hours
·        Left: +254 micron rise
·        Right: +146 micron rise

🔎 Diagnosis:
·        Left (yellow) → pin hole leak = straight line
·        Right (green) → moisture boiling = plateauing line

📌 Knowledge:
Standard practice says a 24-hour standing vacuum is best.
But trending vacuums detail critical data patterns and tell us more than just the endpoint.

AVRPV | Remote Pressure Vacuum
Taking out the guesswork 😊

chillers | evacuations | hvac | teamAV